
Smooth production requires utmost optimization in upstream processing. We are well-equipped to apply a parallel approach as early as possible in the production cascade.
| 1 / 5 | next picture |

Frankfurt, 22-23 September 2010
Juelich receives GMP certificate

Challenging positions in development, production, downstream processing and quality control